PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the North Elevation UCIA roof Facing East.jpg Installed door frames at the 2nd floor Facing North.jpg Installed door frames at the 2nd floor Facing South.jpg Installed electrical split wire above the ceiling at the 1st floor Facing West.jpg Installed electrical split wire for the 3rd floor motorized dampers Facing East.jpg Installed motorized dampers at the 2nd floor Facing West.jpg Sprinkler head at the 2nd floor Facing North.jpg 1st block course at the 2nd floor detention cell Facing East.jpg 3rd floor interior metal framing Facing East.jpg
Previous pageNext page Installed electrical split wire for the 3rd floor motorized dampers Facing East
Installed electrical split wire for the 3rd floor motorized dampers Facing East